# How to track hours with a timer and read the hours report

https://krokul.com/en/blog/track-hours-timer-report/ · Krokul Team · Updated 2026-11-13

Krokul CRM is a B2B CRM for contract-based companies: deals, projects and profit per client in one system, implemented by integration partners. Its Hours screen records time with a timer or by hand and turns it into a report by client and person, with cost, revenue and margin.

**Short answer.** To track hours with a timer in Krokul, start the timer from the top bar on an open task or ticket, stop it when the work ends and correct any entry that looks wrong. Then open the Hours report, choose the period and the grouping by client or by person, and read hours, cost, revenue and margin for each client.

## When does an engineering team need a timer and an hours report?

A team needs both when the hours of engineers become invoices or margin figures, because an estimate made on Friday evening is always lower than the real time. The timer gives the raw entries, and the report turns them into the number that the guide on getting engineers to log time accurately asks you to manage. The topic of [client and project profitability](https://krokul.com/en/blog/topics/project-profitability/) shows what that number feeds.

- Engineers write hours on Friday from memory, and Monday’s emergency call is missing.
- A support hour package runs out, and nobody knew until the client asked for the report.
- The owner sees revenue per client and has no idea what the same client cost in hours.
- Part of the time is not billable, and it goes into the invoice because nobody marked it.

- **Timer session** — A timer session is one measured stretch of work on one task or ticket, with a start and a stop time.
- **Billable hour** — A billable hour is a recorded hour that goes into the completion certificate or invoice for the client.
- **Hour pool** — An hour pool is the number of hours included in a project for a period, after which extra hours are invoiced.

## How do you track hours and read the report in six steps?

### 1. Set the hourly rate once

An admin writes the company’s hourly cost in the company details, and a person with a different cost gets their own rate in the user card. A person without a rate of their own is counted at the company rate. A rate has a history, so a new rate does not rewrite the past months.

Without any rate, the report shows the cost as unknown.

### 2. Start the timer on a task or a ticket

Press the timer button in the top bar and pick an open task or an open ticket, or type a name and create a task on the spot. The timer starts only on an open task or an open ticket, never on both at once, and a task that is not open refuses it.

A person has one timer. Starting a new one stops the previous session with the same timestamp, so there is no gap and no overlap between sessions. Pressing the same task twice does not restart it.

### 3. Stop the timer and finish the entry

Press Stop in the timer panel. Add a description and untick Billable when the hour is not for the client. Reset the session without saving when the timer was started by mistake. The entry appears on the Mine tab of the Hours screen, which lists your hours by day or by week.

### 4. Log by hand what the timer missed, and fix odd entries

Log the hours by hand for work that was never timed: choose the task or ticket, the hours from 0 to 24, the date, a description and the billable mark. In an existing entry you can change the hours, the description and the billable mark.

A timer session longer than 12 hours is recorded in full and marked for review, because it is almost always a forgotten timer. Correct the hours, and the mark disappears.

### 5. Open the hours report and choose the grouping

On the Report tab choose the period, which defaults to the current month and can reach 366 days. Narrow it by person or client, and switch the grouping between People to clients and Clients to people. Expand a row down to projects, tasks and single sessions. Export CSV puts the same table into a spreadsheet.

A user with the agent role sees only their own hours in the report, whatever person they choose. Choose whole calendar months when you want revenue, because revenue is counted for whole months.

![Hours report of a demo company by clients: hours, sessions, cost, revenue, margin per client and over-pool labels](https://krokul.com/img/en/blog/hours-report-clients-people.webp)

### 6. Read cost, revenue and margin per client

Cost is hours multiplied by the person’s rate on the date of the entry. Revenue of a client comes from the client’s current subscriptions for whole months, and the report says so when a month is incomplete or the client has no contract. The row without a client has no revenue, because internal work earns nothing.

Admins and managers see cost, revenue and margin, and only an admin sees the cost of one person. When a project has a monthly hour pool with a rate over the pool, the row shows how many hours went over it and how much that is to invoice.

## What does a client row look like in the hours report?

The table repeats one client row from the demo workspace in the picture above, with the people behind it, so the arithmetic is visible. It is an example from the demo data.

Example from the demo data: one client, four people, September:

| Person | Hours | Cost | Implied rate per hour |
|---|---|---|---|
| Emma Collins | 14 h | £630 | £45 |
| Oliver Hayes | 13 h | £520 | £40 |
| Sophie Turner | 12 h | £384 | £32 |
| Daniel Brooks | 5 h | £275 | £55 |
| Client total | 44 h | £1,809 | Revenue £1,500, margin −£309 (−20.6 %) |

The client cost is the sum of the four rows: 630 + 520 + 384 + 275 = £1,809. Revenue of £1,500 is smaller, so the margin is 1,500 − 1,809 = −£309, which is −20.6 % of revenue. The client row also carries the label “over pool: 14 h · to invoice £1,120”, which shows that 14 hours went beyond the hour pool and are due to be invoiced. Without the report, this client looks fine in the revenue list.

## Which mistakes spoil an hours report?

- Leaving a timer running overnight. Correct the session marked for review, and the report stops overstating the cost.
- Timing client work on a task that has no project or client. The hours land in the row without a client, and the client’s margin looks better than it is.
- Forgetting to untick Billable. Non-billable hours then enter the completion certificate of the project.
- Reading cost before the rates are set. The report shows an unknown cost as unknown, so set the company rate first.
- Comparing months with different rates as if the rate were constant. Krokul keeps the history of the rate and prices each entry at the rate of its date.

## What should the head of delivery check every week?

- Every engineer has a rate, or the company rate is set.
- Sessions marked for review are corrected.
- The report is opened for the last week, grouped by clients.
- Clients with a negative margin or over-pool hours are listed.
- Hours that are not billable are marked as such.

## What do you do with the numbers next?

The report feeds three decisions. A client with a negative margin gets a new price or a new scope, as the guide on watching a fixed-price project for overrun explains. Hours beyond a pool, set on the [project card with scope and hour package](https://krokul.com/en/blog/project-card-scope-hour-package/), are shown with the amount to invoice, and the completion certificate takes only the billable ones. Rates for the team come from one blended number, as in the guide on setting one hourly cost rate. The page on [hours and margin per client in Krokul](https://krokul.com/en/solutions/margin/) shows these screens next to the project card.

The timer, the hours and the projects belong to a higher plan than the free one. The clients and the tasks that the hours attach to can be prepared first.

## Frequently asked questions

### Can I start a timer without a task?

No. The timer starts only on an open task or an open ticket. When the task does not exist yet, type its name in the timer picker and create it there.

### What happens if I forget to stop the timer?

A session longer than 12 hours is recorded in full and marked for review. Stop the timer, correct the hours on the Mine tab, and the mark disappears.

### Who sees the cost of an hour?

Admins and managers see cost, revenue and margin by client, and only an admin sees the cost of one person. A user with the agent role sees only their own hours, without money.

### How long a period can the report cover?

Up to 366 days. A report with more than 50,000 entries is refused with a request to narrow the period or the filter, and is never silently cut.

### Do non-billable hours reach the completion certificate?

No. Untick Billable on the entry, and the hour does not go into the completion certificate of the project.

---