# How to invoice all the work you deliver and stop revenue leakage

https://krokul.com/en/blog/topics/billing-delivered-work/ · Krokul Team · Updated 2026-11-01

In service companies, hours are logged in one place, contracts live in another and invoices come from a third. Work slips between them, and nobody sees the gap until the month is closed. This guide gives a monthly routine that puts every delivered hour on an invoice, then a section for each question on the way.

**Short answer.** To invoice all the work you deliver, record every billable hour against a project, compare delivered work with invoiced work once a week, and issue a completion certificate or invoice for each gap before the month closes. Put the package size and the overage rate in the contract, so every extra hour has a price. Invoice retainers on a fixed day.

## Why delivered work goes unbilled

Work goes unbilled when the person who delivers it and the person who invoices it look at different records. The engineer logs four hours over the monthly package, the project owner does not hear about it, and the finance manager invoices the package price because the contract says so. Nobody made a mistake, and the company still gave away four hours.

The loss is large enough to measure. SPI Research’s 2026 Professional Services Maturity Benchmark puts revenue leakage at 4.5% of revenue. Unbilled work is one part of that loss. A 2025 survey of 273 US agencies by Ignition, a billing vendor, found that only 1% of agencies invoice all work outside the agreed scope. Both figures come from outside surveys, so treat them as a reference point and measure your own number as shown below.

- **Unbilled work** — Unbilled work is work that was delivered to a client, and for which no completion certificate or invoice exists yet.
- **Revenue leakage** — Revenue leakage is the value of delivered work that never reaches an invoice, expressed in money or as a share of the work delivered.
- **Retainer** — A retainer is a recurring agreement in which a client pays a fixed amount each period for an agreed scope or number of hours.
- **Hour pool** — An hour pool is the number of hours a client has paid for in a period, against which logged hours are counted.

## The 6-step routine for billing everything you deliver

Krokul CRM is a B2B CRM for contract-based companies: deals, projects and profit per client in one system, implemented by integration partners. The routine works with any tool, and each step below names the Krokul screen where one exists.

### 1. Write the package, the rate and the overage price into the contract

Every hour needs a price before it is worked. State the hours included in each period, the hourly rate for hours beyond them and the way extra work is approved. A contract that says only “support as needed” gives you nothing to invoice later.

In Krokul, a project holds the paid hours, the pool type (per month or for the whole project) and the hourly rate over the pool.

### 2. Log every hour against a project the day it is worked

Hours recorded at the end of the month are guesses, and guesses lean low. Ask the team to log time daily, with a short note on the task, and to mark hours that are not billable at the time of logging.

In Krokul, hours are written to the project from a timer, from the project card or by hand. Only hours counted as billable go into the completion certificate.

### 3. Warn the project owner when the pool runs out

Tell the project owner the moment logged hours pass the paid amount, while the client can still decide whether to buy more hours or stop the work. A warning on the last day of the month turns the conversation into an argument.

Krokul sends the project owner a notification once per month when an active project with a monthly pool goes over it.

### 4. Review everything unbilled once a week

Open one list of delivered work without an invoice, sorted by the oldest date, and clear it from the top. A weekly review means no item is older than seven days, so the month-end close has nothing left to find.

This is the Unbilled screen in Krokul. It gathers hours over the package, closed project months, contract milestones, won deals and subscriptions, and shows the total in the base currency.

### 5. Create the completion certificate or invoice from the list

Close each row with a document the same week. The document should carry the package line and the overage line separately, so the client sees what was included and what was extra.

In Krokul, a button in the row creates the certificate or the invoice, and the row disappears from the list once the document exists. One live certificate per project per month is allowed, so a second click cannot invoice twice.

### 6. Invoice retainers on a fixed day without a manual step

A retainer invoice that depends on someone remembering will be late some months. Put the contract on a billing schedule and let the system issue each period’s invoice on its day.

In Krokul, a contract with a billing period gets its invoice from a daily check, dated the first day of the period, with a planned payment created alongside. A second run for the same period issues nothing.

> **Tip.** Keep one-time lines such as setup or onboarding out of the recurring part of the contract. They are invoiced once, and a recurring invoice then repeats only the monthly fee.

## How to measure revenue leakage in a professional services company

Revenue leakage in a professional services company is the gap between the value of the hours you delivered and the amount you invoiced for them. Measure it for one closed month, and repeat it every month so the trend shows whether the routine works. The guide on [revenue leakage in professional services](https://krokul.com/en/blog/revenue-leakage-professional-services/) covers the sources of the gap in more detail.

Start with billable hours multiplied by the hourly rate, then subtract everything invoiced for the same work. The result is the unbilled value. Divide it by the delivered value to get the leakage rate.

Example: revenue leakage for one month:

| Line | Hours | Value |
|---|---|---|
| Billable hours logged (at £85 per hour) | 420 | £35,700 |
| Invoiced for the same work | 370 | £31,450 |
| Unbilled work | 50 | £4,250 |
| Leakage rate |  | 11.9% |

The formula is leakage rate = unbilled value ÷ delivered value. In the example, 4,250 ÷ 35,700 gives 11.9%. Fifty hours is more than one working week of one engineer, and none of it will be invoiced unless someone finds it.

## How to find delivered work that was never invoiced

To find delivered work that was never invoiced, list every place where work can exist without a document and check each against your invoices. There are five such places in a typical service company, and the guide on [finding unbilled work](https://krokul.com/en/blog/find-unbilled-work/) shows how to check each of them.

Where unbilled work hides and what to compare:

| Source | What exists | What is missing |
|---|---|---|
| Hours over the package | Logged hours above the paid pool this month | An overage line on a certificate or invoice |
| Closed project month | Billable hours in a month that has ended | A certificate for that month |
| Contract milestone | A delivered stage of a one-time contract | A certificate or invoice for the stage |
| Won deal | A signed deal with products and a price | Any invoice, and no project to invoice through |
| Subscription period | A recurring contract whose period has started | The invoice for that period |

Krokul’s Unbilled screen reads exactly these five sources and applies one set of rules, the same rules the project card uses to compute an overage. Projects are checked over the last three months and won deals over the last 365 days, because older items have usually been written off. A row without an exchange rate to the base currency is listed but left out of the total, and the screen says so.

When a row cannot become a document, the button is replaced by the reason, for example a missing overage rate or a won deal without products. That tells you what to fix in the contract or the deal. The [Unbilled list in Krokul](https://krokul.com/en/solutions/projects/) can be switched from a register of rows to a view grouped by client, which shows who is waiting for the largest invoice.

## How prepaid support hours work and what happens at zero

Prepaid support hours are a block of hours a client pays for in advance, drawn down as the team logs time, with a rule for what happens when the block is used up. The guide on [prepaid support hours](https://krokul.com/en/blog/prepaid-support-hours/) explains the terms in full. The contract has to answer four questions before the first ticket arrives.

Terms of a prepaid hour block:

| Term | Question it answers | Example wording |
|---|---|---|
| Allotment | How many hours per period | 40 hours per month for £3,400 |
| Rollover | What happens to unused hours | Up to 10 hours carry over once |
| Overage | How extra hours are priced | £110 per hour, invoiced with the next regular invoice |
| Notice | When the client is told | At 75%, at 90% and at 100% used |

At zero, one of three things happens, and the contract should say which. Work stops until the client buys more hours, work continues at the overage rate, or the team asks for approval first. Choosing the second without telling the client is the usual source of disputes. A notice before zero lets the client choose.

In Krokul, the project card shows hours used against the pool, and once the pool is exceeded a “+N h over the package” mark with three tiles: the amount to invoice at the overage rate, the cost of the hours and the margin. The [support package setup in Krokul](https://krokul.com/en/for/consulting/) covers the fields.

![Support package project card showing hours this month against the pool and the amount to invoice for hours over](https://krokul.com/img/en/blog/project-pool-exhausted.webp)

## How to invoice retainer overage with a rate, a threshold and a notice

Retainer overage is billed with three decisions made in advance, an overage rate, a threshold at which the client is told and a rule for invoicing the extra hours. The guide on [billing retainer overage](https://krokul.com/en/blog/bill-retainer-overage/) goes through each decision. The rate is usually higher than the package rate, because the client has not committed to the hours.

Example: overage on a 40-hour retainer:

| Line | Hours | Rate | Amount |
|---|---|---|---|
| Retainer package | 40 | £85 (included) | £3,400 |
| Hours logged this month | 46.5 |  |  |
| Hours over the package | 6.5 | £110 | £715 |
| Invoice total |  |  | £4,115 |

The formula is overage amount = (hours logged − hours in the package) × overage rate. In the example, (46.5 − 40) × 110 gives £715. Send the client a notice when 75% of the package is used, repeat it at 90%, and ask for a decision at 100%. By the time the invoice arrives, every number on it has been seen before.

## How to invoice retainers automatically every month

To invoice retainers automatically, store each retainer as a contract with a billing period and let the system issue the invoice on the first day of every period. The guide on [automating retainer invoicing](https://krokul.com/en/blog/automate-retainer-invoicing/) lists the settings to check before turning it on.

A monthly retainer cycle:

| When | What happens | Who acts |
|---|---|---|
| First day of the period | The invoice for the month is issued, dated the first day | The system |
| Three days before the due date | A reminder goes to the client contact | Account owner |
| End of the month | Hours over the package become an overage line | Finance |
| Month close | Good practice: fix the totals and review changes after that | Finance |

Krokul creates the recurring invoice in this way. A daily check finds contracts whose period has started, issues one invoice per period and creates the planned payment with it. If the check runs twice, or someone presses the manual button as well, the second attempt finds the first invoice and does nothing. Subscription revenue by month lives on the Subscriptions and MRR screen, and a closed month there is read from a journal and is not rewritten silently. It can be changed only by deliberately reopening it. Month closing in Krokul exists for MRR only, so the month-end routine for invoices is a working practice of your team.

## How to invoice fixed-price projects by milestones

A fixed-price project is billed by milestones when each delivered stage triggers its own certificate or invoice, so the amount invoiced follows the work delivered. The guide on milestone billing for fixed-price projects explains how to compare billed and delivered values. Keep one table with both numbers for every contract.

Example: £30,000 fixed-price contract, billed against delivered:

| Milestone | Value | Delivered | Invoiced |
|---|---|---|---|
| 1. Survey and design | £6,000 | Yes | Yes |
| 2. Cabling and racks | £9,000 | Yes | Yes |
| 3. Network configuration | £9,200 | Yes | No |
| 4. Cut-over and handover | £5,800 | No | No |

Delivered value is £24,200 and invoiced value is £15,000, so £9,200 is waiting for a document. That is the number a weekly review should surface. In Krokul, the unfinished stages of a one-time contract appear as the Contract stages source on the Unbilled screen, and the act is created from the stages you tick. A stage that is already fully covered cannot be selected again.

![Dialog for creating an act from contract stages, with finished stages disabled and two stages open](https://krokul.com/img/en/blog/act-from-contract-stages.webp)

## How to turn logged hours into a completion certificate and invoice

To turn logged hours into a completion certificate and invoice, sum the billable hours for the period, split them into hours inside the package and hours over it, and create the certificate before the invoice. The guide on invoicing from a timesheet covers rounding and approval.

Example: one month on a 30-hour package at £2,400:

| Engineer | Billable hours | Not billable |
|---|---|---|
| Engineer A | 12 | 1 |
| Engineer B | 18.5 | 0 |
| Engineer C | 9.5 | 2 |
| Total | 40 | 3 |

The package covers 30 hours, so 10 hours are over it. At £95 per overage hour, the certificate has a package line of £2,400 and an overage line of £950, which gives £3,350. The 3 hours that are not billable appear in the timesheet and stay off the certificate. In Krokul, the certificate for a month is built from the project’s billable hours in this way, a preview shows the lines before anything is saved, and the invoice is created from the certificate.

## How to log out-of-scope requests and get paid for them

To get paid for out-of-scope requests, log each one as it arrives with the hours it takes, tell the client it is outside the package and invoice it at the overage rate. The guide on billing for scope creep gives wording for the notice. Ignition’s survey, mentioned above, is vendor data, and it points at the same habit, since a request that nobody logs cannot be invoiced.

Example: an out-of-scope request log:

| Date | Request | Hours | Client informed | Action |
|---|---|---|---|---|
| 3 Nov | Extra report for the finance team | 2.5 | Yes, by email | Invoice at overage rate |
| 9 Nov | Second user training session | 1.5 | Yes, on the call | Invoice at overage rate |
| 17 Nov | Quick fix to a field name | 0.25 | Yes | Included as goodwill |

Decide in advance which requests are goodwill, and record them anyway. A goodwill entry that is logged shows the client what they received for free, and it feeds the margin view of the project. Krokul does not mark requests as out of scope. Hours logged to a project count against its pool, and hours beyond it are priced at the overage rate, which gives the same method with the package as the boundary.

## Month-end billing checklist for a service company

A month-end billing checklist makes sure that nothing delivered in the month is missing from an invoice before the books close. The guide on the month-end billing checklist is a copyable version. The short form fits one page.

- Confirm that everyone has logged hours up to the last working day.
- Open the unbilled list and clear every row older than seven days.
- Create a certificate for each project month that has billable hours.
- Add overage lines for projects whose pool was exceeded.
- Check that each retainer has its invoice for the month.
- Look at won deals from the last quarter that have no invoice.
- Compare delivered value with invoiced value and note the leakage rate.
- Close the month in your accounting routine, so later changes are deliberate.

## Which billing mistakes cost service companies the most

- Logging hours at month end. Hours written from memory are lower than hours worked; log time on the day and mark billable hours at that moment.
- Having no overage rate in the contract. The team then absorbs the extra hours to avoid a conversation; write the rate and the approval rule before the first ticket.
- Telling the client at invoice time. A surprise overage is disputed; send notices at 75%, 90% and 100% of the package.
- Invoicing the package and forgetting the stage. A delivered milestone without a document is revenue the company has earned and not collected; compare delivered with invoiced every week.
- Repeating one-time lines on a recurring invoice. Setup fees then recur every month; keep recurring lines apart from one-time lines.

## Where to start: a decision table

Pick the row that matches what you see today, make that change this week and read the guide for it.

Symptoms, first fix and the guide to read:

| Symptom | First fix | Guide |
|---|---|---|
| Nobody knows how much work is unbilled | Measure leakage for one closed month | Revenue leakage |
| Delivered work has no invoice | Run one weekly review of unbilled work | Finding unbilled work |
| Clients argue about support hours | Write allotment, rollover and notice into the contract | Prepaid support hours |
| Overage is absorbed by the team | Set an overage rate and a notice threshold | Retainer overage |
| Retainer invoices go out late | Put each retainer on a billing schedule | Automatic retainer invoices |
| Fixed-price work is billed at the end | Invoice each delivered milestone | Milestone billing |
| Certificates are typed by hand | Build the certificate from logged hours | Invoice from a timesheet |
| Extra requests are done for free | Log every request and price it | Scope creep billing |
| The month closes in a rush | Use one checklist every month | Month-end checklist |

## Sources

- SPI Research, Professional Services Maturity Benchmark, 2026. Revenue leakage at 4.5% of revenue.
- Ignition, survey of 273 US agencies, 2025 (vendor data). Only 1% of agencies invoice all work outside the agreed scope.

## Frequently asked questions

### How soon after the work should I invoice?

Invoice in the same month the work is delivered, and for milestones on the day the stage is accepted. The payment term starts on the invoice date, so each week of delay moves the payment by a week.

### Do I need a time tracker to invoice by the hour?

You need a record of hours that the person who invoices can see. A spreadsheet works for a handful of projects, and a timer attached to the project removes the retyping once there are several.

### What should I do when a client disputes extra hours?

Show the log with dates and notes, and the notices you sent at 75% and 90%. Offer to invoice the disputed hours separately, so the undisputed amount is paid on time.

### Should small requests be invoiced?

Record them all, and invoice the ones above a threshold you set in advance, for example 30 minutes. Requests below it are goodwill, and the log shows the client how much of it they receive.

### Who should own the unbilled list?

One finance person owns the weekly review, and each project owner answers for the rows of their projects. This gives every row a named person without making billing a full-time job.

---

App: https://app.krokul.com/ · API: https://app.krokul.com/api/v1/docs
