# How to track project margin from time tracking

https://krokul.com/en/blog/project-margin-from-time-tracking/ · Krokul Team · Updated 2026-11-12

Project managers and owners of service companies often know what a project earns and only guess what it costs. This guide compares three ways to record time and shows how recorded hours become one margin figure per project.

**Short answer.** Project margin from time tracking is the revenue of a project minus the cost of the hours logged on it, shown as a share of revenue. Record time with a timer, a weekly timesheet or a monthly recollection, set one cost per hour, mark billable hours, and compare revenue with hours cost every month.

## When do you need project margin from tracked time?

You need project margin from tracked time when the price of a project is fixed or agreed per period and the cost is mostly people. It is the project-level view of the wider question in [which clients and projects make money](https://krokul.com/en/blog/topics/project-profitability/), and the client-level view is in the guide on [calculating client profitability from hours and revenue](https://krokul.com/en/blog/calculate-client-profitability/).

- A fixed-price project is closing and nobody can say what it cost.
- The same team works on three projects and each manager believes theirs is profitable.
- Engineers write hours into a spreadsheet on Friday and the totals never match the invoices.
- A client asks for more scope and you need the real cost of the last phase to price it.
- The owner wants one margin figure per project at month end, calculated from recorded hours.

- **Project margin from time tracking** — Project margin from time tracking is the revenue of a project minus the cost of the hours logged on it, usually shown as a percentage of revenue.
- **Cost per hour** — Cost per hour is what one hour of a person costs the company, for example salary and taxes divided by working hours, and it is different from the price the client pays.
- **Billable hours** — Billable hours are logged hours that the client pays for, and non-billable hours are logged hours the company absorbs.

## Which time tracking method gives a reliable project margin?

A timer gives the most reliable project margin because it records time while the work happens. A weekly timesheet is acceptable for steady work, and a monthly recollection works only as a rough estimate. The table compares the three on the points that decide whether the margin can be trusted.

Three ways to record project time:

| Method | Accuracy | Effort per person | Main risk | Best for |
|---|---|---|---|---|
| Timer | High, time is recorded as the work happens | Two clicks per task | A forgotten timer inflates one entry | Engineers and support staff who switch between tasks |
| Weekly timesheet | Medium, filled in from notes or a calendar | About 15 minutes on Friday | Short tasks are rounded or skipped | Steady work on one or two projects |
| Monthly recollection | Low, memory fades within days | One long session at month end | Hours drift toward the project that was on top of mind | A rough estimate when nothing else exists |

Mix methods by role. Use the timer for people who switch tasks, a timesheet for people who work on one project for days, and review the exceptions weekly. The guide on getting engineers to log time accurately covers the habits that keep any method honest.

## How to track project margin from time tracking in six steps

Tracking project margin from time means fixing three inputs, revenue, hours and cost per hour, and comparing them on a schedule. Run the steps once to set up and then repeat steps four to six every week and month.

### 1. Fix the revenue of each project

Write down one revenue figure per project before work starts. For a fixed price it is the contract amount, and for a retainer it is the monthly fee.

Keep the figure next to the project and change it only through a documented scope change, so margin always compares against the same number.

### 2. Set one cost per hour for each role

Divide the yearly cost of a person by the working hours of the year. Use a separate figure for each role, or one blended figure for a small team.

Record the date the figure starts, because a raise should change future months and leave closed months as they were.

### 3. Choose the recording method for each role

Give the timer to people who switch between tasks several times a day and a timesheet to people who stay on one project for days.

Require that every entry names a project, because hours without a project can never reach a margin figure.

### 4. Log every hour and mark billable ones

Record all hours worked, including meetings, rework and unpaid fixes. Mark the hours the client pays for as billable and keep the rest as non-billable.

Cost counts every hour, and the billable mark decides which hours go into the completion certificate or invoice.

### 5. Review exceptions every week

Once a week, look for entries that are far longer than a working day, projects with no hours, and people with fewer hours than their schedule.

Fix an error while the week is fresh, because a correction after a month relies on memory again.

> **Tip.** Review hours on Monday morning, while the previous week is still easy to reconstruct.

### 6. Calculate margin at month end and compare

Multiply each person’s hours by their cost per hour, add the results and subtract the total from the project revenue. Divide the margin by the revenue to get a percentage.

Put the result next to the plan you made when you priced the project. A gap of more than a few points deserves a conversation about scope, staffing or price.

## How to calculate project margin from logged hours?

Project margin equals project revenue minus the sum of hours times cost per hour for every person. The example below prices a fixed-price project at £9,000 with three roles, and the second table shows what happens when hours go unrecorded.

Example: margin of one fixed-price project from logged hours:

| Role | Hours | Cost per hour | Cost |
|---|---|---|---|
| Engineer A | 40 | £35 | £1,400 |
| Engineer B | 30 | £45 | £1,350 |
| Project manager | 12 | £60 | £720 |
| Total cost of hours | 82 |  | £3,470 |
| Revenue |  |  | £9,000 |
| Margin |  |  | £5,530 (61.4%) |

Margin = revenue − Σ (hours × cost per hour). Margin % = margin ÷ revenue × 100. In the example, 9,000 − 3,470 = 5,530, and 5,530 ÷ 9,000 = 61.4%.

Example: the same project when 10 hours of Engineer A go unrecorded:

| Case | Cost of hours | Margin | Margin % |
|---|---|---|---|
| All hours recorded | £3,470 | £5,530 | 61.4% |
| 10 hours of Engineer A missing | £3,120 | £5,880 | 65.3% |
| Difference | £350 | £350 | 3.9 points |

Ten missing hours lift the margin by 3.9 points and the project looks healthier than it is. The formula is simple, so the quality of the margin depends on how completely hours are recorded.

## Which mistakes distort project margin from time tracking?

- Leaving non-billable hours out of cost. The margin looks higher, so count every hour and use the billable mark only to decide what the client pays for.
- Using one cost per hour for the whole company. A senior engineer and a junior coordinator then look equal, so set a cost for each role.
- Changing the cost per hour for past months. Old projects then change their margin, so apply a new figure from its start date only.
- Filling hours once a month. Recollection loses short tasks, so record daily with a timer or at least weekly.
- Comparing a project’s revenue with hours of the whole client. Other projects then pollute the figure, so attach hours to a project from the first entry.

## A checklist for monthly project margin

Copy the list into your month-end routine and run it for every active project.

- Confirm the revenue figure of each project, including approved scope changes.
- Check that every person has a cost per hour valid for the month.
- Review entries longer than a working day and fix forgotten timers.
- Check that every active project has hours and every person has hours.
- Calculate cost of hours, margin and margin percentage per project.
- Compare each margin with the plan and write the reason for any gap above a few points.
- Send projects with a gap to the project manager before the next month starts.

## How Krokul turns tracked time into project margin

Krokul CRM is a B2B CRM for contract-based companies: deals, projects and profit per client in one system, implemented by integration partners. Its Hours screen and the project card apply the six steps to the hours your team logs.

People start the timer on an open task or ticket, and typing a new title creates the task and starts the timer in one step. Each person has one timer, and starting a new one stops the previous entry at the same moment, so the entries leave no gap or overlap. Entries made by hand carry a date, a description and a Billable mark. Hours can be edited later, while the start and stop times of a timer entry stay unchanged. A session longer than 12 hours is saved in full and flagged for review.

The Mine tab shows a person’s own day or week, and the Report tab groups hours by people and clients or by clients and people for any period. Cost is hours multiplied by the person’s cost per hour on the date of the entry, or the company cost per hour when the person has none, and a new figure does not rewrite past months. Revenue in this report is the client’s active subscriptions for whole calendar months, and a client without a subscription shows no revenue instead of a zero. Admins and managers see cost, revenue and margin, and only admins see the cost of an individual person.

![Hours report by client with hours, cost, revenue and margin columns and people listed under the first client](https://krokul.com/img/en/blog/project-margin-hours-client-report.webp)

A fixed-price project has its own answer on the project card. The Hours panel shows the hours cost, the project amount and the margin by hours, which equals the project amount minus the cost of logged hours. The project amount is the amount of the deal the project came from, or an amount entered on the project, and goods cost is not included. Roles that cannot see cost do not receive these lines. The [timer and hours log in Krokul](https://krokul.com/en/solutions/projects/) page shows how projects, hours and certificates connect, and [project margin by hours in Krokul](https://krokul.com/en/solutions/margin/) describes the margin reports.

![Project card with an Hours panel showing hours cost, project amount and margin by hours above the hours log](https://krokul.com/img/en/blog/project-margin-hours-project-card.webp)

## Frequently asked questions

### Should non-billable hours count in project margin?

Yes, every logged hour is part of the cost of the project. The billable mark only decides which hours the client pays for, and Krokul keeps non-billable hours out of the completion certificate while counting them in cost.

### What happens if someone forgets to stop the timer?

The entry becomes far longer than the real work, and the margin falls. Stop the timer, correct the hours in the entry and continue. Krokul flags any session over 12 hours so the correction does not wait for month end.

### Can I start the timer without a task?

In Krokul the timer starts on an open task or ticket. When no task exists, type a title and Krokul creates the task and starts the timer together, so the hours always belong to a project through that task.

### How often should I check project margin?

Check hours every week and margin every month. Weekly checks catch recording errors early, and the monthly figure compares the project with the plan you made when you priced it.

### Does project margin include overhead such as rent?

Project margin from tracked time counts only the cost of people’s hours. Rent, tools and sales costs belong in the company result, and Krokul’s margin figures count hours only.

---